Skip to main content

Panels, Service Upgrades, Subpanels & EVEMS

Electrical Services in Toronto & the GTA: 100A to 200A Panel Upgrades, Full Service Upgrades, Subpanels & DCC-9 Load Management

Best EV Charger Installation Toronto is Toronto's dedicated EV-charging-focused electrical contractor across the GTA. We handle the full spectrum of electrical capacity work: 100A to 200A panel swaps from $2,500 CAD, full 200A service upgrades with new mast and meter base from $3,500 CAD, dedicated EV subpanels, and DCC-9 or DCC-12 EVEMS load management devices under OESC Rule 8-106.

Every quote starts with an OESC Section 8 load calculation, then presents the cheapest compliant option first: subpanel or EVEMS where they suffice, panel upgrade where the numbers require it, full service upgrade where the utility feeder is the bottleneck. Toronto Hydro, Alectra, Oakville Hydro, Burlington Hydro, and Elexicon Energy coordination is handled end to end.

Same-day quote. Fixed written pricing. ESA permit and Certificate of Acceptance included.

Licensing

ESA/ECRA Licensed

Response

Same-day quote, next-day install

Insurance

$2M Liability · WSIB

Rebate

Ontario HRS filed for you

Electrical services

Electrical Services We Cover Across Toronto & the GTA

Four capacity-focused services, quoted after an OESC Section 8 load calculation. We recommend the cheapest compliant path, not an automatic panel upgrade.

Compare paths

Panel Upgrade vs Service Upgrade vs EVEMS Load Management

Three different paths to adding EV charging capacity. The right one depends on your load calculation, service size, and how much of the house is on the panel.

Path Typical cost Timeline When it fits
DCC-9 or DCC-12 EVEMS $500 to $1,200 Same day 100A home with panel space, occasional peaking
Dedicated subpanel $1,500 to $2,800 1 day Main panel has kW capacity but no breaker space
100A to 200A panel upgrade $2,500 to $4,500 1 day + inspection Load calc exceeds 100A even with EVEMS
Full 200A service upgrade $3,500 to $5,500 1 to 2 weeks Mast, meter base, or utility feeder is the bottleneck

Not sure which electrical path fits your home?

Book a load calc. We measure, then quote the cheapest compliant option, not an automatic upgrade.

FAQ

Electrical Services Questions, Answered

How much does an electrical panel upgrade cost in Toronto?

A 100A to 200A panel swap runs $2,500 to $4,500 CAD in Toronto and the GTA, covering the new panel, breakers, OESC Section 8 load calculation, ESA permit, and inspection. A full service upgrade with new mast and meter base adds $3,500 to $5,500 CAD because it involves Toronto Hydro or Alectra disconnect and reconnect work. Combined with a Level 2 EV charger install, most homes land at $4,000 to $7,300 CAD.

What is the difference between a panel upgrade and a service upgrade?

A panel upgrade replaces the breaker panel inside your home, keeping the existing service mast, meter base, and utility feeder. A service upgrade replaces everything from the utility point of attachment down: mast, meter base, service entrance cable, ground plate, and often the panel too. Panel upgrades take 1 day; service upgrades take 1 to 2 weeks because the utility has to schedule a disconnect and reconnect.

Do I need a permit for an electrical panel upgrade in Ontario?

Yes. Every panel or service upgrade in Ontario requires an Electrical Safety Authority permit, an OESC Section 8 load calculation, and an ESA inspection with a Certificate of Acceptance issued at close-out. That Certificate of Acceptance is what your home insurer, mortgage lender, and any future buyer will ask for. We file the permit and coordinate the inspection as part of every quote.

How do I know if I need a panel upgrade or a load management device?

It depends on the load calculation. If your existing service has spare kW capacity but no physical breaker space, a subpanel is often the cheapest answer. If the service is genuinely at capacity, a load management device (DCC-9 or DCC-12 under OESC Rule 8-106) sheds the EV load when the house peaks, satisfying code without an upgrade. A full 100A to 200A upgrade is warranted when the load calculation exceeds 100A even with an EVEMS device installed.

Which GTA utilities do you coordinate service upgrades with?

Toronto Hydro (City of Toronto), Alectra Utilities (Mississauga, Brampton, Vaughan, Markham, Aurora), Oakville Hydro (Oakville), Burlington Hydro (Burlington), Elexicon Energy (Ajax, Whitby, Pickering, Richmond Hill), Newmarket-Tay Power, and Hydro One in outlying communities. We file the service upgrade application, coordinate the disconnect and reconnect date, and schedule the ESA inspection around the utility timeline.

How long does a panel upgrade take on install day?

A 100A to 200A panel swap with no service upgrade takes 6 to 10 hours on install day, plus the ESA inspection typically within 24 to 72 hours. Your power is out for 4 to 6 of those hours while we swap the panel. A full service upgrade with mast and meter base takes 1 to 2 weeks total because it depends on the utility disconnect and reconnect window.

Still have a question about your panel or your charger?

Ask Our Crew
Electric vehicle charging from a wall-mounted Level 2 charger in a Toronto garage

2026 Ontario EV Rebate: up to $5,000 for eligible installations

Book your electrical load calculation today

ESA-permitted panel and service upgrades across the GTA with Toronto Hydro, Alectra, Oakville Hydro, Burlington Hydro, and Elexicon Energy coordination handled for you.

  • ESA permit and inspection included
  • Fixed written pricing, no hidden fees
  • Rebates filed on your behalf
Call Now Free Quote